A005.
Agricultural conversion
The project involves the partial conversion of an existing agricultural multipurpose hall into a biomass drying and biochar production facility with a pyrolysis heating boiler. For this purpose, spaces for storage, drying, and a fire protection room for the heating boiler are separated and designated as new areas. Outside, storage containers for the dried biomass and biochar are placed. The facility uses on-farm biogenic fuels for ecological electricity and heat generation.
Project costs:
n/a
GFA:
990 m²Project duration:
12/2021 – 02/2022
Services:
Phases1-4 [Establishing the basis of the project, Preliminary design, Final design, Building permission application]
![Site plan](https://freight.cargo.site/t/original/i/46bef5a90aae33b8307aee5a291c966eabcf3f346a16a638bb439231f657a94a/A005_L_1000_graadwies.jpg)
![Floor plan](https://freight.cargo.site/t/original/i/e2434f302ec470c1d2bdb44359d7f64c3fc7ee7db0be8a31f37737d406538782/A-07.4-A005_G.jpg)
![Section](https://freight.cargo.site/t/original/i/25a34bbdd10bbe20e07fe008974934af0cc89903f34a5031c10b7fb44e7ee7fc/A-07.1-A005_S.jpg)
![Elevation: north east](https://freight.cargo.site/t/original/i/f82456f974387f1884a19a9f47f6d678f3ec9ace0cf4768398c545a2a3391a57/A-07.3-A005_A_N.jpg)
![Elevation: south east](https://freight.cargo.site/t/original/i/c730767502788c34bfb23ff99cefbd5dafe42a0b9f5d05b587dbfe1c8c183432/A-07.2-A005_A_W.jpg)