A005.
Agricultural conversion
The project involves the partial conversion of an existing agricultural multipurpose hall into a biomass drying and biochar production facility with a pyrolysis heating boiler. For this purpose, spaces for storage, drying, and a fire protection room for the heating boiler are separated and designated as new areas. Outside, storage containers for the dried biomass and biochar are placed. The facility uses on-farm biogenic fuels for ecological electricity and heat generation.
Project costs:
n/a
GFA:
990 m²Project duration:
12/2021 – 02/2022
Services:
Phases1-4 [Establishing the basis of the project, Preliminary design, Final design, Building permission application]